Mincing Lane - London

Architect Arup Associates Developer British Land Developments Ltd Contractor Bovis Lend Lease Ltd.

Completed

The building at Mincing Lane, at 2 Plantation Place was completed in 2004, with 6000 m2 cladding. At levels 2 to 6 at the south and east elevations the cladding panels are installed at and connected to the back of precast concrete columns and beams, that form part of the building structure. This cladding type is also used at a facetted corner at Great Tower Street and Mincing Lane.
    © 2009 | Scheldebouw b.v.