![]() |
||
DS5 - LondonArchitect Cesar Pelli Associates, Adamson Associates Developer Canary Wharf Group plc Contractor Canary Wharf Contractors Ltd.CompletedThe DS5 building at 25 Canada square was completed in 2001 with 50.000 m2 curtain walling. The building is built at the same time as DS2, at the opposite side of the square, with exactly the same height of 210 m. The infill of the cladding panels consists of insulated glazing or curved stainless steel sheet work in front of the columns and floors.
|
|
|
| © 2009 | Scheldebouw b.v. |






